Search

Community + Civic + Worship

Harvest Bible Chapel

Greater Than 150,000SF, Building / Ground-up, Build-out, Infrastructure, Renovation, Sitework, Greater Than $20 Million

Harvest Bible Chapel

Leopardo completed four major construction projects totaling 500,000 square feet for this suburban mega church and its multiple campuses.

  • Completed the conversion of a 40,000-sf warehouse to establish the Crystal Lake campus, which included an 800-seat auditorium, children’s ministry classrooms, multi-purpose rooms, cafeteria and bookstore (2008).
  • Built two phases of a three-level, 300,000-sf addition at Harvest’s main Elgin campus. The new 2,500-seat auditorium featured a 54-foot tall audience chamber with a tiered floor, catwalk structures and theatrical lighting. The project also included children’s ministry classrooms, multi-purpose rooms, cafeteria, bookstore, gymnasium and extensive audio/video equipment installations (2007).
  • Built a 50,000-sf school known as Harvest Christian Academy at the Elgin campus. The elementary and middle school included 20 new classrooms, a 630-seat temporary worship center, library, science laboratory, art room, gymnasium and kitchen (2004).
  • Converted a 106,000-sf warehouse, located just off Illinois Rt. 53, into Harvest’s Rolling Meadows campus. The project included a two-story, 265-seat worship center with tiered seating, gymnasium, admin office and new chapel (2000).