Integrys Energy Group
Integrys relocated to its new 160,000-square-foot space on five floors of the Aon Center in the summer of 2014. Leopardo completed the build-out of Integrys’ space in just 19 weeks, a fast pace made possible because Leopardo professionals devised ways to work more efficiently. The project featured:
- Demolition of existing finishes
- Numerous carpet styles and lighting fixtures, ceramic flooring and high-end finishes throughout
- Elevator lobbies and conference rooms on each floor with curved walls and glazed art-glass insets
- Installation of videoconferencing systems on numerous floors
- Installation of a Skyfold vertically folding operable wall partition in the training room
- Renovation of 10 restrooms, including new plumbing, and construction of five new ADA-compliant restrooms