• Concourse C Expansion and Renovation included the expansion of security checkpoint to accommodate changing TSA requirements and improvements included widening, in-fill, renovation and remodel of airline operation and administrative areas and construction of an eight gate “Hammerhead expansion”
  • Concourse D Expansion and Renovation included a two-story, 98,845-SF multi-phase with ground-level boarding
  • Two two-story atriums of floor-to-ceiling windows to bring in natural light
  • Concourse E Expansion and Renovation included security checkpoint expansion, concourse renovation and electrical service upgrades
  • Outbound Baggage, Ticket Counter Reconfiguration Inline Baggage Security Phase I included demolition and reconfiguration of all original ticket offices, baggage make-up rooms and baggage conveyor systems in response to heightened 9/11 security measures
  • Outbound Baggage Handling System Operation, Maintenance and Management included demolition and reconfiguration of all original airline-exclusive baggage conveyor systems into a shared system consisting of four outbound baggage conveyor and make-up carousels