• 530,000-SF industrial design-build industrial and office space
  • High-performance glass ribbon windows and a full-height glazed curtain wall at the main entrance
  • Reduce the cost of the building shell by upwards of a half-million dollars, by altering the geometry and configuration of the precast exterior and fenestration
  • Substantial reengineering of the MEP/FP systems and general construction methods