- New food processing and blending facility with an on-site packaging area
- Conference and meeting room with skylights, high-end millwork and remodeled kitchen laboratory
- Required a sophisticated exhaust and dust collection system in the blending area
- Six openings cut into precast concrete for window installations
- Installation of an exterior tower system to meet the client’s stringent requirements
- Special consideration was given to FDA requirements and regulations specific to Priority Foods’ operational needs, including an exterior stone ring for repelling insects and rodents