• New food processing and blending facility with an on-site packaging area
  • Conference and meeting room with skylights, high-end millwork and remodeled kitchen laboratory
  • Required a sophisticated exhaust and dust collection system in the blending area
  • Six openings cut into precast concrete for window installations
  • Installation of an exterior tower system to meet the client’s stringent requirements
  • Special consideration was given to FDA requirements and regulations specific to Priority Foods’ operational needs, including an exterior stone ring for repelling insects and rodents