- Renovation of a vegetable processing facility
- Processing and production area renovation and build-out
- Cooler and freezer built with insulated panels and a glycol floor system
- Redesigned and rebuilt 10 interior and exterior docks
- Provided all electrical and mechanical requirements for processing, such as steam, condensate, glycol, electric, compressed air, potable water requirements and process waste requirements