- 565,484-SF design-build redevelopment of a former glass manufacturing plant—vacant and without utilities for over a decade—into a fully operational industrial park
- Heat exchangers used in offshore drilling
- 30,000-SF office demolition and build-out
- Upgraded lighting systems throughout the entire facility to improve efficiency and visibility
- Coordinated installation of 42 bridge cranes with 1,000 tons of runway support steel
- Provided all new electrical production infrastructure to service 50 welding booths and six paint booths
- Provided explosion containment for welding gases and paint storage
- Included the coordination and installation of over (300) 480V disconnect switches