Design Phase FINAL 004
Design Phase FINAL 001
Design Phase FINAL 002
Design Phase FINAL 003
Design Phase FINAL 007
Design Phase FINAL 005
Design Phase FINAL 006
Projects

Design Phase Warehouse Addition

Location
Waukegan, Illinois
Market
Industrial
Type
Addition/Expansion
Architect
Ware Malcomb
  • Addition of a warehouse onto an existing building with three additional loading dock doors
  • Excavation and precast concrete panel system with exterior windows, structural steel bar joist system with makeup air unit temperature controls, and wet fire sprinkler system with full high bay LED lighting system
  • Construction of an additional parking lot with fire lane and drainage system

Let’s Get It Done.

Contact Leopardo's construction experts today to get your project started.

Jeff Seidelmann 1200

Jeff Seidelmann

Vice President, Retail
Scroll to Top