- 1M-SF installation of new structural steel supports and screens for new exterior Ramp Information Display System screens at 32 Southwest Airlines gates
- New electrical and low voltage infrastructure throughout for each Ramp and Gate Information Display system
- Installation of a new air blown fiber backbone from each IDF/MDF throughout the airport
- New jet bridge speaker system at each jet bridge
- Self-performed trades included demolition, rough carpentry, finish carpentry, drywall, and painting