- Multi-phased construction with close coordination with ORD stakeholders for cargo storage
- Removal of existing coating in two climate-controlled coolers with HEPA containment
- Sawcut and joint replacement
- Floor drain reconstruction and installation of new heavy duty traffic covers
- Applied new Sherwin Williams Polyaspartic Aluminum Oxide coating with required floor prep to exhibit exceptional resistance to abrasions, chemicals, and UV radiation within the coolers
- Applied new safety striping along with bumper and barricade installation
Let’s Get It Done.
Contact Leopardo's construction experts today to get your project started.


