Phase 1

  • 45,000-SF build-out across two floors
  • Concrete floor leveling, marble, carpeting and wood throughout
  • Custom woodwork, including wood walls, ceilings, benches, convector enclosures, display cases, oval conference table and reception desk
  • New mechanical systems, including VAV and fan-power boxes with DDC controls, life safety and security systems and pre-action fire protection systems

Phase 2

  • 215,000-SF, 10-floor interior demolition and build-out
  • Concrete leveling, MEP infrastructure renovation on all floors,
  • New elevator stop on a transfer floor to tie high and mid-rise floors together
  • Conference center floor with multiple rooms all equipped with extensive audiovisual capabilities and conference room reservation system
  • High-end millwork throughout with integrated LED lighting, wall panels and fabric panels, specialty flooring and wall finishes, wood ceilings, colored glass, demountable glass partitions and Skyfold partitions