• Renovation of an existing cytology lab
  • Project completed in two phases in a fully-occupied lab operating 24/7
  • Provided preconstruction and planning services for the phasing sequencing to keep the labs operational throughout construction
  • Relocated the building’s existing plumbing and HVAC to accommodate the space’s new layouts
  • Maintained close coordination with the owner and vendor for the installation of lab equipment and furniture
  • Installation of continuous epoxy flooring including disruptive floor prep during normal operating hours
  • Charcoal filters were used at all air returns and HEPA machines with charcoal filters were used to clean the air to control the odor of the epoxy floor